Across the social housing sector, first‑time access to a tenant's home runs at 73%. Every wasted visit costs around £60. On current trends the sector will spend around £1 billion on failed access over the next decade. Everything in this document is built around that number, and around what happens once the door opens.
Sector figures: Housing Quality Network, Opening the door: changes to support necessary access to social tenants' homes, December 2025; cost estimates from the Association of Safety and Compliance Professionals cited in the same research.
The Safety and Quality Standard requires you to hold accurate, up‑to‑date information about the condition of every home you own. Awaab's Law widened during 2026 from damp and mould to excess cold, falls, structural, fire and electrical hazards, and is expected to reach almost all HHSRS hazards by 2027. Social rented homes must reach EPC C by 1 April 2030.
Every one of those obligations is answered out of stock data. And stock data is only ever as good as the number of front doors you actually got through.
That is where survey programmes fail. Not in the surveying. In the access.
A programme reported at 94% complete with 6% never entered is not 94% compliant. It is a gap with a date on it.
So this document spends its first half on access. Sections 04 to 06 set out how we contact residents, what happens the day nobody answers, and what the exception log looks like. Sections 07 to 14 cover mobilisation, the system, the data you get back and the commitments we will sign up to.
A field delivery partner. We survey domestic properties at volume, get into more of them than a two‑letters‑and‑a‑phone‑call approach does, and show you where every property stands every day without you having to ask for it.
We are not bidding against your consultant. We scope every survey around your asset management strategy, so the data carries it. The strategy stays yours.
Most of our work today is delivered as a subcontractor to consultancies and main contractors. Our FY26 accounts are being rebuilt to support direct council financial due diligence.
If your process needs a prime contractor with ten years of filed turnover, that is not us yet. We would rather you knew that on page two than page twenty.
1. What is your first‑visit access rate, and how exactly do you measure it?
2. How many contact attempts before you declare no access, and is every attempt logged against the property?
3. Can I see the live exception list myself, today, without emailing anyone?
On a Warm Homes: Social Housing Fund programme the pre‑works survey and the post‑works EPC sit either side of your installation. Neither of them pays you. Either of them can stop you.
RdSAP 10 has been live since 15 June 2025 and made every domestic EPC materially longer: every window measured individually, lighting counted by type, ventilation categorised. Assessor capacity across the market tightened at exactly the point Wave 3 volumes peaked.
We are the survey and lodgement layer underneath your programme. Pre‑works EPC, stock condition, PAS 2035 retrofit assessment alongside your appointed Coordinator, and post‑works EPC lodged the same day as the survey.
Four EPC accreditation bodies means a scheme requirement never turns into a two‑week delay.
A dedicated in‑house survey team you can turn on for a programme and turn off at the end of it, without carrying the headcount in between and without agency assessors on your client's doorsteps.
We have mobilised a programme in under 48 hours.
We do not hold Level 5 Retrofit Coordination and we do not install. If you need a Coordinator to sign off PAS 2035, or a PAS 2030 installer, we are the wrong call.
We are the field survey and EPC layer. That is deliberate, and it is what we are good at.
1. How fast can you mobilise, and what does "mobilised" mean in your answer?
2. Which EPC accreditation bodies are your assessors registered with?
3. When you cannot get in, how quickly do I hear about it, and in what form?
You have won the programme. The problem is several thousand properties, a fixed window, and a headcount you cannot justify carrying past the end of it.
Agency assessors solve the number and create a quality problem: inconsistent evidence, re‑surveys, a QA burden that lands on your team, and a client who eventually notices.
We are seven DEA‑qualified surveyors working as one team, under one QA regime, running on our own programme management system. You keep the client relationship, the methodology and the report. We deliver field volume in your format, to your standard, and hand back clean data.
We are a subcontractor by design, not by accident. We do not approach your clients and we are not building a consultancy.
You send the property schedule. We load it, run the access programme, deliver the surveys and return the data in your template. Your name is on the report.
Where you want it, we will run the resident contact and booking too, which is usually the part that is eating your project managers.
Domestic EPC only. No NDEA, OCDEA, DEC or SBEM, and no new‑build SAP. Retrofit assessment at Level 3, never coordination. No HHSRS rating and no fire risk assessment.
You will not have to unpick an overstated capability halfway through a programme.
1. Are these your own surveyors, or are you re‑subcontracting to agency?
2. What does your QA gate actually check before data reaches me?
3. Whose system holds the evidence, and what happens to it at the end?
None of the obligations below is solved by a survey. Every one of them starts with one.
| Date | Obligation | Why it reaches a surveyor |
|---|---|---|
| Oct 2025 | Awaab's Law, phase one. Social landlords must investigate reports of significant damp and mould and act on emergency hazards within statutory timescales. | Hazard obligations are defended from property condition records. |
| 15 Jun 2025 | RdSAP 10 live. Every window measured individually, lighting counted by type, ventilation categorised, wall insulation in 25 mm increments. | Every domestic EPC takes materially longer. Market assessor capacity is tighter than it was. |
| 1 Dec 2025 | Electrical Safety Standards extended to the social rented sector, applying first to new tenancies. | Another statutory visit competing for the same front door. |
| 1 May 2026 | Same standards apply to tenancies that began before December 2025. | Access demand across social stock steps up sharply. |
| 2026 | Awaab's Law widens to excess cold and heat, falls, structural hazards, fire safety and electrical risk. | Condition data must now cover far more than damp. |
| 1 Nov 2026 | Deadline for completed electrical checks across existing social tenancies. | A hard date, sector‑wide, with roughly four million homes behind it. |
| 2027 | Awaab's Law expected to reach almost all HHSRS hazards, now scored under the revised HHSRS (21 hazards) in force since 23 June 2026. | Stock condition data becomes a standing legal exposure, not a five‑year exercise. |
| 1 Apr 2030 | All social rented homes to EPC C, with a £10,000 per‑property cost cap and a time‑limited exemption route. | Every property needs a current, accurate EPC before anyone can plan the works. |
| 1 Apr 2039 | Compliance to be demonstrated against a second EPC metric. | Re‑assessment at portfolio scale, again. |
RICS consulted until February 2026 on a code of practice for residential stock condition surveys, and the National Housing Federation is working with RICS on a standard survey for social landlords. There has never been an agreed sector methodology. There is about to be one.
Demand is dated and rising, and the constraint is not surveying skill. It is field capacity and access. Programmes will be won and lost on how many doors open first time, and on whether the client can see the ones that did not.
Most capability documents only contain the left‑hand column. The right‑hand column is the one that tells you whether to believe the left.
Every item on the right is something a competitor may tell you they can do. Under PAS 2035, coordination has to be signed off by a qualified Coordinator, so a supplier who claims it and does not hold it cannot lawfully deliver what they sold you. Ask for the certificate, not the brochure. We would rather lose ten instructions we cannot deliver than win one we cannot.
HQN's 2025 research put tenant vulnerability, digital exclusion and pressured lives well ahead of deliberate refusal as the reasons access fails. Residents said clear communication before the visit, and an easy way to rearrange it, is what decides the outcome. So that is where the effort goes.
What the visit is for, how long it takes, who is coming, and three ways to book it on the same page: a QR code straight into the booking system, the booking link written out, and a phone number. Written for a resident, not for a file. Translated on request.
Landlords in the HQN research improved access simply by renaming the visit in tenant‑facing language. We use your wording, agreed before the first wave goes out.
Books in two taps on the device the resident actually uses, instead of a phone call in office hours.
The channel many residents actually answer, and one that leaves a written record. Carries the same three booking routes as the letter: QR code, link and phone number.
A single 10am call to somebody who works days is not an attempt. It is a box being ticked.
The cheapest intervention in the programme, and the one most often skipped.
Where a surveyor is already on the street, the appointment is made at the door and written straight into the job record.
Evening and Saturday appointments as standard where a programme needs them. A female surveyor where a resident asks and one is available. Short, specific slots, not all‑day windows.
Every attempt is written against the property in the job record, under these field names, and is visible to you the same day.
knock_attempts
last_knock_date
last_knock_outcome
booked_on_door
access_confirmed
service_refusal
service_refusal_reason
exception_flag
A failed visit costs roughly £60 whether the cause was a refusal or an unread letter. Fixing the unread letters is far cheaper, and almost nobody does it.
The card carries the same three booking routes as the letter: QR code, link and phone number, so the resident can rebook that evening without waiting for us. The attempt is recorded against the property with date, method and outcome before the surveyor leaves the street.
Not parked on a list for the end of the programme, which is how properties quietly become statistics.
Different day of the week, different part of the day. If two attempts fall in the same slot, that is one attempt repeated.
If letters have failed, we call. If calls have failed, we message. Changing the channel is what changes the outcome.
Every attempt, date, method, outcome and note. If it ever has to go further, that is the record your legal team needs, and it exists from day one.
"No access" on its own is useless to you. Every exception carries the reason, and the reason usually has a fix.
| What we find | What we do |
|---|---|
| Dog in the property | Agree containment with the resident and rebook, rather than record a refusal. |
| Intercom or door entry broken | Route through concierge, keyholder or your housing officer. |
| Resident asks for a female surveyor | Reallocate where we have availability, and tell you if we cannot. |
| Property appears void | Confirmed with you before it is removed from the programme. Never assumed. |
| Works already in progress | Deferred with a date, not closed. |
| Hoarding or evident vulnerability | Flagged to you and handed to your tenancy or support team. No doorstep pressure, ever. |
| Genuine refusal | Reason recorded in the resident's own terms and escalated to you the same day. |
We do not close a property as "no access" to protect a completion percentage. An honest exception log is worth more to you than a flattering one, because you are the one who has to answer for the gap.Sayed Habib, Director
The screen below is the operations view of a 356‑property social housing programme running in Strata OS. The right‑hand column is the exception log: every property that could not be completed, with the reason written in plain English, dated and attributed to a surveyor.
Those are the exception types the system records, in the words a surveyor actually enters: three knock attempts with a letter sent; a neighbour confirming occupancy; a resident concerned about disruption; an intercom that does not work and a keyholder being chased; a request for a female surveyor; a dog to be contained; two attempts and a WhatsApp message sent.
Not one of them says "no access". Each one says what is actually wrong, which is the only version you can do anything with.
SLA state is calculated per job from the due date, not asserted in a monthly report. "At risk" appears before the breach, which is the only point at which anybody can still act.
We have mobilised a programme in under 48 hours. Five days is what we quote, so that we beat it.
Order accepted, Data Processing Agreement executed, one named programme lead on each side with a direct mobile number. No shared inbox.
You send the schedule as CSV or XLSX. We validate it, geocode every address, flag anything that will not resolve, and come back to you with the exceptions before we load it.
Survey type, evidence template, SLA clock and reporting cycle set up. Your client dashboard goes live and your login is issued the same day.
Letters out, SMS and WhatsApp sequence started, call list built. Surveyors allocated by geography so travel time is not being billed as survey time.
First appointments booked and visible to you on the dashboard as they land.
Evidence through QA, first EPCs lodged, first weekly report issued with access performance in it from week one.
Missing resident phone numbers do not stop the programme. They change the channel mix, and we will tell you what that costs in access rate.
Before the first letter goes out we agree with you what the visit is called, what the letter says and whose name is at the bottom of it. Residents open post from their landlord. They do not open post from a surveying company they have never heard of.
The Survey Programme Management System is not a reporting tool. It runs the programme, and every feature came from a problem on a live job.
A completion percentage tells you where you have been. The weekly delivery rate tells you whether the end date is still real. If the run rate drops for two weeks, the recovery conversation happens then, not in month five.
On a programme heading for the 2030 EPC C obligation, the band distribution is the output that actually matters. Seeing it build as the survey progresses lets you start scoping works before the programme closes.
It is the least flattering number a survey supplier can publish and the most useful one you can have. It is on your dashboard from the first week, and it is how you hold us to the rest of this document.
The surveyor works entirely in the field app. Every action is recorded at the property and appears on your dashboard within seconds. No end‑of‑day uploads, no evening data entry, and no gap between what happened and what is recorded.
The job record carries rdsap10_compliant, windows_measured and bulb_count_recorded. A survey that has not captured what RdSAP 10 requires does not pass through as complete.
Photographs are taken against a defined category list and attached to the job before the surveyor leaves. photo_count and evidence_complete are gates, not statistics.
Jobs are allocated geographically and the same map drives field routing, our operations view and your dashboard. One source of truth, three audiences.
Not Started → Scheduled → In Progress →
Evidence Upload → QA Review → Completed
A job that fails review goes to QA Fail and back to the surveyor. It cannot reach Completed by being marked Completed. The required fields have to be there first.
Domestic EPC evidence is captured to WI01 v14, covering the mandatory photographic categories required by the accreditation scheme, and retained for fifteen years.
If your scheme, funder or auditor asks for the evidence pack behind a lodgement in year eight, it exists.
Element‑level inspection with photographic evidence recorded against each element, condition scored to a Decent Homes aligned template, and delivered in the field structure you specify.
You do. The survey data, the evidence and the photographs are yours. We are the processor, you are the controller, and the DPA says so before the first visit.
The point of a QA gate is that it is inconvenient. If it never sends anything back, it is not a gate.
Keystone, Civica Cx, NEC Housing, Aareon, MRI and Northgate asset and housing management systems, plus in‑house data warehouses.
Where you use HACT's UK Housing Data Standards we will align export field naming to it. Where you do not, we match your template exactly.
No mainstream UK housing management system offers a contractor a live write API. Any supplier promising "direct integration with your system" is describing a structured file import with better marketing.
What actually determines whether your data lands cleanly is whether the field structure, value lists and property references were agreed before the first survey rather than after the last one. We do that in mobilisation, with your systems team in the room.
Weekly written report as standard: delivered, booked, exceptions by reason, access performance and forecast completion date. Monthly programme review by call if you want one. The dashboard is live regardless, so the report is analysis rather than news.
Ask any supplier for a sample export in your own field structure before award, not after. If it takes them more than a few days to produce one, the reconciliation work will land on your team at the end of the programme, and it will cost more than the survey fee you negotiated.
Standard programme terms, configured at mobilisation, measured automatically and visible on your dashboard rather than reported by us.
| Commitment | Standard | How you verify it |
|---|---|---|
| Mobilisation from signed order to first survey | 5 working days | Dashboard live on day one; first completed jobs visible with dates. |
| EPC turnaround from instruction to lodged certificate | 8 days | sla_status per job: on track, at risk, breached. |
| Stock condition turnaround from instruction to delivered data | 12 days | Same, on the same screen. |
| Exception logged after a failed visit | Same day | Exception log entry timestamped against the property. |
| Re‑booking after a failed visit | Within 24 hours | Scheduled date on the job record. |
| EPC lodgement after survey | Same day | Lodgement reference on the property row. |
| Written programme report | Weekly | Issued to your named contact, with access performance in every one. |
| Escalation response from your named lead | Same working day | Direct mobile, not a shared inbox. |
| Councillor, MP or resident enquiry evidence pack | 1 working day | Visit history, notes, photographs and findings against the property reference. |
The breach appears on your dashboard before it appears in a conversation, because it is calculated, not declared. You will normally know at the "at risk" stage, which is the point at which it can still be recovered.
A missed SLA gets a written cause and a recovery plan within one working day. Programme‑level remedies are agreed in the contract rather than improvised afterwards, and we are willing to have them written in.
We will not quote you an access rate from somebody else's programme, and we will not put a first‑visit percentage on a cover page that we cannot evidence on yours.
You will have our real access performance on your own stock, in writing, from week one. That is a harder promise than a number in a brochure and a much more useful one.
Presented anonymised by sector, programme type, scale and year. Our surveyors bring years of combined delivery across social housing, local authorities and consultancies, and the programmes below reflect that collective record rather than a list of logos.
| Sector | Programme | Type | Scale | Year |
|---|---|---|---|---|
| Social housing, London HA | EPC and stock condition survey programme | EPC + SCS | 356 properties | 2024 |
| Housing association | EPC programme delivery | EPC | 200+ | 2023 |
| Local authority | Compliance survey programme | EPC + SCS | ~250 | 2023 |
| Housing association | EPC programme delivery | EPC | 160 | 2023 |
| Portfolio landlords | EPC and compliance | Multi | 1,000+ | Ongoing |
Much of this work was delivered by our surveyors through consultancies and other intermediaries, where the end client contracted with someone else. Naming those organisations would imply a direct relationship that did not exist, and any procurement team that checks would find that out.
We would rather show you the operational evidence and let you test it than borrow credibility from a logo we are not entitled to use. Client references can be arranged directly at shortlist stage.
The same dedicated team on every programme. Not a rota of contractors assembled per contract, which is how evidence quality drifts and how a resident ends up opening the door to somebody nobody can vouch for.
BSc Civil Engineering and MSc Construction Management, City, University of London, with a background spanning construction, electrical contracting and multi‑site operational delivery. Lectures on the electrotechnical qualification programme at HRUC.
That operational discipline is the reason the Survey Programme Management System exists. It was not bought in and it was not a side project. It was built because programmes were being run on spreadsheets and WhatsApp chains and it was not good enough.
Khalid, Lead Surveyor. Active since 2018. Runs delivery on the ground and sets the standard for evidence quality and exception management.
Nabil, Senior Surveyor. Active since 2018. Has delivered some of our largest EPC and stock condition programmes.
Sulaiman, Surveyor. BSc Building Surveying.
Four further surveyors, all DEA‑qualified and trained internally to the same QA and evidence standard. Two members of the team additionally hold the Level 3 Award in Domestic Retrofit Assessment.
Agency assessors are paid per job, not per programme. That is a rational incentive to complete easy properties and record the difficult ones as no access. A team carrying the programme to the end has the opposite incentive, and it shows up in the exception log.
All accreditations are independently audited annually. Reference numbers and certificates are available on request and we will send them before you ask.
| Accreditation | Scope |
|---|---|
| Elmhurst Energy | Domestic EPC. One of the two largest EPC accreditation bodies and required for ECO4 lodgements. |
| ECMK | Domestic EPC. Accepted across major funding schemes including ECO4 and LA Flex. |
| Quidos | Domestic EPC. Major independent accreditation body. |
| Sterling | Domestic EPC. Four‑body coverage means scheme continuity whatever the programme requires. |
| PAS 2035 | Whole‑house retrofit process standard. We deliver Level 3 retrofit assessment within it, alongside your appointed Coordinator. |
| TrustMark | Government‑endorsed quality scheme required for ECO4 and Warm Homes works. |
| NICEIC | Held by the company for its electrical contracting activity. Listed for completeness; electrical installation is not part of the survey offer in this document. |
| ICO registered | UK GDPR and Data Protection Act 2018. We act as processor, you as controller. DPA prepared to Article 28(3) standard. |
£5,000,000
£2,000,000
£10,000,000
Underwritten by Markel International Insurance Company Limited. Increased cover available on request for larger instructions. Certificates issued at mobilisation as standard.
A fair question. Three things reduce it: your data lives in a system you can export from at any point, so you never hold a folder of half‑finished work; the evidence is yours contractually from day one; and we scope programmes to a volume our own team can carry, rather than winning on a number and recruiting to meet it.
For a direct public‑sector appointment, possibly not today. Historic survey income was invoiced outside the company and FY26 accounts are being rebuilt with a full profit and loss to fix that. For a subcontract appointment under your own contract, which is how most of our work is delivered, the test is normally your supply chain policy rather than a public procurement financial threshold, and we carry PI £2m, PL £5m and EL £10m. We would rather set that out plainly than fail your due diligence at stage two.
Jobs are held against the programme, not the individual. Reassignment is a reallocation on the map, and the new surveyor opens the property with its full history, including every access attempt made before them. Nothing sits in one person's notebook. This is also a settled core team working together since 2018, so agency‑style churn is not the risk here.
You own it. We process it under a DPA executed before mobilisation. At programme end you take a full export; EPC evidence is retained fifteen years to meet accreditation requirements, everything else to your retention instruction.
Yes. We have done it in under 48 hours. The limiting factor is almost never us, it is how quickly the property schedule and the DPA come back.
Yes, and it is standard for us. One access arrangement instead of two roughly halves the resident disruption and removes an entire round of booking, which is where most of the programme cost that nobody budgets for actually sits.
Yes. Our assessors are registered with Elmhurst, ECMK, Quidos and Sterling, all accepted by the major scheme providers, and we are TrustMark registered.
No. Every survey is delivered by our own DEA‑qualified team. If we ever could not, we would tell you before the programme started rather than after you noticed.
The refusal and the resident's stated reason go on your dashboard the same day. We continue contact through the remaining channels unless you tell us to stop, and if it reaches enforcement you already hold a complete, dated record of every attempt.
Ask us for a live dashboard walkthrough and ask us to open the exception log, not the completion ring. Any supplier will show you a completion percentage. The exception log is where you find out how a business behaves when things go wrong.
Thirty minutes. We open a real programme dashboard, including the exception log, and you decide whether the operational claims in this document are true.
Send us your data template. We review it against the reformed Decent Homes Standard, the revised HHSRS and HACT's data standards, and return written recommendations with a populated sample your systems team can test.
Give us fifty properties from the hardest part of your stock. Access performance on difficult stock tells you more in three weeks than any tender response will.
Tell us the property count and the date it has to be finished by. Within one working day we will confirm whether we can mobilise, what the delivery shape looks like, and if we cannot do it, we will say so.