✓ Multi-Accredited
✓ High-Capacity Delivery
✓ Rapid Mobilisation
✓ Quality Assured
NICEIC-REGISTERED ELECTRICIANS — LONDON & SOUTH EAST

House Rewiring — Safe, Compliant, Minimally Disruptive

Full and partial rewiring for homeowners, landlords and developers. Bring older properties up to current 18th Edition standards, support refurbishments and modernise rental properties. Clear quotes, professional work, NICEIC certification on completion.

NICEIC
Registered
18th Ed
Wiring Regs Compliant
5-10 Days
Typical Project
10-Year
Workmanship Warranty
WHEN A REWIRE MAKES SENSE

Rewiring Is a Major Project — Done Right, It Lasts 30+ Years

Most homes need a full rewire every 30-40 years. Cabling degrades, circuits become inadequate for modern loads, and old cloth-covered or rubber-insulated wiring becomes a fire risk. If your property has any of the warning signs — cloth/rubber wiring, round-pin sockets, dimming lights when appliances start, recurring fuse trips — a rewire isn’t optional, it’s overdue.

Full House Rewires

Complete electrical replacement — new consumer unit, all circuits, sockets, switches, lighting points. Suitable for unmodernised properties or properties with widespread issues.

Partial Rewires

Targeted rewiring of specific circuits or rooms — kitchens, bathrooms, extensions, or where existing wiring is faulty but not entirely degraded.

Refurbishment Wiring

Working alongside builders on extensions, loft conversions and major refurbs. First fix and second fix electrical co-ordinated with main contractor programme.

Landlord Property Modernisation

Rewires often paired with EICR remedial works to bring tenanted properties to compliance and tenant-attractive standard. Phased work with tenants in situ where feasible.

EV-Ready Wiring

All rewires future-proofed with capacity for EV chargers, solar PV, heat pumps and battery storage — supporting EPC C 2030 readiness.

BS 7671 Compliance

All wiring installed to current 18th Edition standards. Surge protection, RCBO protection per circuit, modern consumer unit. Certified on completion.

Why Choose Strata for Your Rewire

Rewires are disruptive — but they don’t have to be chaotic. Our team plans the work in stages, works one room or zone at a time, dust-sheets thoroughly and clears up daily. Most full rewires take 5-10 working days; smaller projects 2-4 days. We give honest quotations including any plastering, decoration coordination and building control notification. No surprises, no creep.

What's Included as Standard

OUR PROCESS

Six Stages from First Visit to Energised

We have refined our rewire process over hundreds of projects. Clarity at every stage — for you, for your decorator, and for any other trades on site.

01

Pre-Rewire Survey

We visit, walk through every room, agree socket and lighting positions, identify special requirements (TV, audio, smart home), and document existing supply.

02

Written Quote

Detailed quotation listing every circuit, every socket, every switch. Pricing transparent. Adjustable based on your priorities.

03

First Fix

Existing circuits made safe. New cabling installed throughout the property. Back-boxes mounted. Floor and wall channels cut as needed.

04

Plastering Window

We pause to allow your decorator/plasterer to make good the chases. Co-ordinated programme with your other trades.

05

Second Fix

Sockets, switches, light fittings and consumer unit installed. Smoke/CO alarms commissioned. Final connections made.

06

Test, Certify, Notify

Full testing to BS 7671. NICEIC certificate issued. Building control notification submitted. Power energised. Project closed.

FREQUENTLY ASKED QUESTIONS

Common Questions

A typical full domestic rewire ranges from £4,500 to £9,000 for a 2-3 bedroom property — including consumer unit, all wiring, sockets, switches, lighting and certification. Larger properties, complex layouts and high specifications increase costs. Partial rewires from £1,500. Always free written quotation.

Full rewire of a 2-3 bedroom property typically takes 5 to 8 working days. Larger or complex properties 10-15 days. Partial rewires 2-4 days. We work efficiently but never compromise quality for speed.

Often yes, especially for partial rewires. For full rewires, we work room by room — you can stay if you have flexible space, but most clients prefer to be elsewhere for the most disruptive 2-3 days. Tenants in rental properties usually stay throughout.

Yes, unless you opt for surface-mount conduit or trunking (rare in domestic). Cable chases need plastering after first fix. We co-ordinate with your decorator/plasterer and price the electrical work cleanly. Plastering and decoration are typically separate trades.

We install Cat6 data cabling, TV co-ax, AV cabling and smart home wiring as part of a rewire — usually at marginal additional cost compared to retrofitting later. Worth specifying upfront.

Yes. Listed buildings have specific requirements (concealed cabling, sympathetic fittings, sometimes lime-plaster considerations). We advise during survey and price accordingly. Cottages, conversions and unusual builds are routine for our team.

All Strata rewires carry a 10-year workmanship warranty alongside the standard manufacturer warranties on consumer units and components. NICEIC’s complaints procedure also provides additional consumer protection.

Planning a Rewire? Let's Discuss

Free pre-rewire survey and detailed written quotation. Honest advice on whether you need a full rewire, partial, or just specific upgrades.