PAS 2035 Retrofit Assessment in London and the South East
Whole-dwelling condition, ventilation and occupancy assessments with RdSAP modelling and measured floor plans, delivered alongside your appointed Retrofit Coordinator for Warm Homes funded programmes.
The Assessment Baseline Every Funded Retrofit Starts From
Since 30 March 2025 all government-funded domestic retrofit in the UK has had to follow PAS 2035:2023. Under the standard, no measure is designed or installed until a qualified Retrofit Assessor has surveyed the dwelling and the Retrofit Coordinator has used that data to plan the improvement package. Get the assessment wrong and the design, the funding claim and the TrustMark lodgement all sit on bad data.
Strata's team includes two surveyors holding the Level 3 Award in Domestic Retrofit Assessment, supported by our DEA-qualified surveyors for the RdSAP element. We provide the assessment baseline your appointed Retrofit Coordinator and principal contractor need, at the volume and consistency a Warm Homes programme demands.
Dwelling & Condition Assessment
Whole-property inspection covering construction, fabric condition, damp and moisture observations, existing insulation, heating and hot water, plus measured floor plans and the RdSAP energy assessment.
Ventilation Assessment
Existing background ventilation, extract fans, trickle vents and door undercuts recorded against PAS 2035 and Approved Document F, so the Coordinator can specify ventilation upgrades alongside fabric measures.
Occupancy Assessment
Household energy use, heating patterns, comfort and health observations and vulnerability flags, captured respectfully in the home to inform the Coordinator's risk assessment and improvement plan.
Assessment Data That Installers Can Build From
PAS 2035 assessment data is not a report that sits in a folder. It is the record the Coordinator uses to design external wall insulation, loft and cavity measures, ventilation and heating upgrades, and the record TrustMark lodgement is checked against. We capture it to be used: measured, photographed and consistent across every home in the batch.
Built for Warm Homes: Social Housing Fund and Local Grant Delivery
The Warm Homes: Social Housing Fund (Wave 3 running to 2028) and the Warm Homes Local Grant both require TrustMark-registered professionals working to PAS 2035:2023. With ECO4 closed since 31 March 2026 and the £13.2 billion Warm Homes Plan now the primary route, registered providers and their contractors need assessment capacity that can keep pace with installation gangs. That is the gap we fill.
Why Subcontract Retrofit Assessments to Strata?
- ✓Lodgement-ready files: assessment outputs formatted for your Coordinator's TrustMark Data Warehouse lodgement, with photographs and floor plans attached.
- ✓Combined-visit option: retrofit assessment, stock condition and EPC captured in one appointment to protect resident goodwill on long programmes.
- ✓Programme visibility: every assessment tracked in our Survey Programme Management System, so your Coordinator and contractor see exactly which homes are ready for design.
- ✓Clear scope: we assess; your appointed Coordinator coordinates, designs and lodges. No blurred accountability under PAS 2035.
Retrofit Measures Our Assessments Support
PAS 2035 Retrofit Assessment FAQs
Scope, funding and how we work with your Retrofit Coordinator.
The survey layer underneath your programme.
Twenty pages on how we deliver pre-works EPC, stock condition and PAS 2035 retrofit assessment at volume: mobilisation in five days, resident access, evidence and QA, data in your format, and the SLAs we will sign up to.
Written for main contractors and their supply chain · 20 pages · PDF
Certified & Regulated Compliance
Fully Accredited Across UK Statutory & Funding Frameworks
Discuss Your Programme Scope or Request a Specification Quotation
Direct consultation with our qualified surveying leadership. We review schedules and respond within 4 business hours.